Horse Pen Creek Road Project Planning Study

Funding for the improvement of Horse Pen Creek Road, between Battleground Avenue and New Garden Road, was approved as part of the November 2008 Transportation Bond referendum. This study will include public involvement and build on the previous feasibility study in order to further evaluate the 3.4-mile section and finalize the proposed conceptual design for the corridor.


September 22 Public Meeting Materials

Public Comment Period Ends October 2

Recommended Alternative

You may provide input to the study by contacting project manager Chris Spencer.


April 30 Public Meeting Materials

Concept Plans

Alternative 1 - 5 -- Lane Section with Center Turn Lane

Sheet 1 - New Garden Road to Quaker Run Drive
Sheet 2 - Quaker Run Drive to Future Greensboro Urban Loop Bridge
Sheet 3 - Future Greensboro Urban Loop Bridge to Brinton Drive
Sheet 4 - Brinton Drive to Battleground Avenue (US 220)

Alternative 2 - 4 -- Lane Divided Section with Landscaped Median

Sheet 1 - New Garden Road to Quaker Run Drive
Sheet 2 - Quaker Run Drive to Future Greensboro Urban Loop Bridge
Sheet 3 - Future Greensboro Urban Loop Bridge to Brinton Drive
Sheet 4 - Brinton Drive to Battleground Avenue (US 220)

Alternative Typical Sections

 Public Meeting Handout


Other Links of Interest

Horse Pen Creek Road Feasibility Study (2004)