Horse Pen Creek Road Project Planning Study
Funding for the improvement of Horse Pen Creek Road, between Battleground Avenue and New Garden Road, was approved as part of the November 2008 Transportation Bond referendum. This study will include public involvement and build on the previous feasibility study in order to further evaluate the 3.4-mile section and finalize the proposed conceptual design for the corridor.
September 22 Public Meeting Materials
Public Comment Period Ends October 2
Recommended Alternative
You may provide input to the study by contacting project manager Chris Spencer.
April 30 Public Meeting Materials Concept Plans
Alternative 1 - 5 -- Lane Section with Center Turn Lane
Sheet 1 - New Garden Road to Quaker Run Drive Sheet 2 - Quaker Run Drive to Future Greensboro Urban Loop Bridge Sheet 3 - Future Greensboro Urban Loop Bridge to Brinton Drive Sheet 4 - Brinton Drive to Battleground Avenue (US 220)
Alternative 2 - 4 -- Lane Divided Section with Landscaped Median
Sheet 1 - New Garden Road to Quaker Run Drive Sheet 2 - Quaker Run Drive to Future Greensboro Urban Loop Bridge Sheet 3 - Future Greensboro Urban Loop Bridge to Brinton Drive Sheet 4 - Brinton Drive to Battleground Avenue (US 220)
Alternative Typical Sections
Public Meeting Handout
Other Links of Interest
Horse Pen Creek Road Feasibility Study (2004)
|