Streetscape Projects

These projects generally do not increase the traffic capacity of a roadway, but have been identified in areas that require aesthetic improvements or major rehabilitation. These projects are identified as short-term needs and are proposed to be fully funded for construction within the next 10 years. 

What do you think?
Please complete our Online Survey to provide feedback on transportation needs.

ID Streetscape Projects Owner District

Estimated
Cost ($M)

SS-1 S. Elm-Eugene St (J.J. Dr to Vandalia Rd) City 1

$2.3

SS-2 Church St Streetscape (Washington St to Lindsay St) City 1, 2

$9.7

SS-3 Summit Avenue (Murrow Blvd to Sullivan St) City 2

$10.0

SS-4 Lee Street (Eugene St to High Point Rd) State 1, 5

$7.5

SS-5 High Point Road (Lee St to I-40 Bus) State 1, 5

$7.5

SS-6 S. Eugene St (Lee St to Florida St) City 1, 5

$4.8

Subtotal =>

$41.8