Connections 2025 Table of Contents
Click on the chapter name to view the full text of each chapter. The associated figures are listed below each chapter.
Plan Elements
1.0 Introduction
Figure 1-1 Piedmont Triad Region
Figure 1-2 Guilford County Cities and Towns
2.0 Vision Statement
3.0 Plan Development
Figure 3-1 Area Types
Figure 3-2 Factors for Change
Figure 3-3 Trend Growth Scenario
Figure 3-4 Preliminary Concept
4.0 Land Use
Figure 4-1 Existing Land Use
Figure 4-2 Generalized Future Land Use
Figure 4-3 Growth Strategy
5.0 Community Character
Figure 5-1 Parks, Open Space, & Natural Resources
Figure 5-2 Community Structure
Figure 5-3 Listed Historic Resources
6.0 Housing and Neighborhoods
7.0 Economic Development
8.0 Transportation
Figure 8-1 Roadway Network
Figure 8-2 Transit System
9.0 Community Facilities
Figure 9-1 Community Facilities
10.0 Implementation
Table 10-1 Action Plan