Contact: Scott Cherry
Phone: (336) 373-2371

Weekly Resurfacing Update, September 22

GREENSBORO, NC -- (September 18, 2008 ) -- The City of Greensboro’s Engineering and Inspections Department will be resurfacing various city streets during the week of September 22 :

Milling: 
Gorrell St. from MLK to Murrow Bridge
Randolph St. from Florida St. to MLK
Randolph St. from Florida St. to MLK
MLK Dr. from 2204 MLK to Florida St.

Patching:
Gillespie St. from 401 Gillespie to McConnell
Randolph St. from Florida St. to MLK
MLK Dr. from 2204 MLK to Florida St

Manhole and Valve Adjustment Locations:
Gillespie St. from 401 Gillespie to McConnell  
Gorrell St. from MLK to Murrow Bridge
Gorrell St. from Benbow to O’Henry
Randolph St. from Florida St. to MLK
MLK Dr. from 2204 MLK to Florida St.

Resurfacing – Asphalt Top Placement Locations:
Tucker St. from Textile to Phillips Ave
Gillespie St. from 401 Gillespie to McConnell
King St. from Gorrell to McAdoo
McAdoo from Gorrell to King
McAdoo from  Murray to Gorrell 
Gorrell St. from MLK to Murrow Bridge
Gorrell St. from Benbow to O’Henry

Motorists should expect delays on these streets.

 #  #  #