|
Contact: Scott Cherry Phone: (336) 373-2371
Weekly Resurfacing Update, September 22
GREENSBORO, NC -- (September 18, 2008 ) -- The City of Greensboro’s Engineering and Inspections Department will be resurfacing various city streets during the week of September 22 :
Milling: Gorrell St. from MLK to Murrow Bridge Randolph St. from Florida St. to MLK Randolph St. from Florida St. to MLK MLK Dr. from 2204 MLK to Florida St.
Patching: Gillespie St. from 401 Gillespie to McConnell Randolph St. from Florida St. to MLK MLK Dr. from 2204 MLK to Florida St
Manhole and Valve Adjustment Locations: Gillespie St. from 401 Gillespie to McConnell Gorrell St. from MLK to Murrow Bridge Gorrell St. from Benbow to O’Henry Randolph St. from Florida St. to MLK MLK Dr. from 2204 MLK to Florida St.
Resurfacing – Asphalt Top Placement Locations: Tucker St. from Textile to Phillips Ave Gillespie St. from 401 Gillespie to McConnell King St. from Gorrell to McAdoo McAdoo from Gorrell to King McAdoo from Murray to Gorrell Gorrell St. from MLK to Murrow Bridge Gorrell St. from Benbow to O’Henry
Motorists should expect delays on these streets.
# # #
|