Greensboro, NC
Home MenuInfrastructure, Construction Plan Review
- Engineering Plan Review - construction drawing review for water, sewer, and roadways
- Utility Pavement Cut Policy
- Right-of-Way Encroachment Permit General Guidelines
- Public Infrastructure Bonding Procedures
- Infrastructure Information Security Policy
- Water and Sewer Line Construction Standard Specifications
- Click here for related water/wastewater/stormwater requirements
- Standards for Water, Sewer, and Sewage Lift Station Design
- Click here for related water/wastewater/stormwater requirements
- Standard Roadway and Utility Drawings
- Meter Installation Drawings
- Backflow Installation Drawings
- Click here for backflow prevention information
- Developer's Operational Agreement
- Click here for related water/wastewater/stormwater requirements
- Home/Property Owner's Operational Agreement
- Click here for related water/wastewater/stormwater requirements
- Stormwater Best Management Practices
- If proposed work requires an easement release (Technical Review Committee action)
- If required work relies on a modification of LDO standards
- If proposed site or building work is within in a local historic district
- If proposed work is within a Special Overlay District
- If proposed work requires Board of Adjustment (BOA) consideration
- Fee Schedule, BOA meeting calendar, Process Flowchart
- Applications for variance, interpretation, appeal and special exception
- BOA Rules and Regulations Manual
- If proposed work requires a change in the zoning of the site or other Zoning Commission review
- Fee Schedule, Planning and Zoning Commission meeting calendar, Process Flowchart
- Application for Special Use Permits (heard by Planning and Zoning Commission), straight and conditional rezoning (heard by Planning and Zoning Commission and possibly City Council), and Comprehensive Plan Amendment
