Southeast Greenway

Print
Press Enter to show all options, press Tab go to next option

Southeast Greenway (1.2 miles)

  • Surface: Asphalt
  • Traffic: Multiple Use

The Southeast Greenway, constructed in 2013, now links the Downtown Greenway to Sussman Park. The greenway connects to the Downtown Greenway near the Freeman Mill off ramp and Lee Street. This greenway was made possible through 2008 Parks and Recreation Greenway Bonds.

How do I get there?

The Southeast Greenway can be accessed from Sussman Park where parking is available on the street.

  • View detailed map
  •  

    Please note:

    The Southeast Greenway is a multiple-use trail. Bicycles are allowed and encouraged. The trail is open daily from sunrise to sunset.