Metropolitan Transportation Plan

Print
Press Enter to show all options, press Tab go to next option

2040 Metropolitan Transportation Plan

The 2040 Metropolitan Transportation Plan (MTP) (formerly called the Long Range Transportation Plan)Has undergone amendments since it was approved September 2015. The previous amendments along with the current amendment are listed below.

Current Amendment - Amends the 2040 MTP along with the 2018-2027 document. The amendment complies with federal regulations to establish performance measures for infrastructure condition, infrastructure reliability, and transit assets. The amendment has been made to ensure transportation projects are able to continue to move through the planning, design process and construction.

Amendment 2 - May 2018 amended May 2018 along with the 2018-2027 MTIP document. These documents were amended to comply with federal regulations to establish performance measures for safety. The amendment has been made to ensure transportation projects are able to continue to move through the planning, design process and construction.

Amendment 1 - November 2017 to account for changes to the highway project listings resulting from Prioritization 4.0 and the FY 2018-2027 TIP development process. The amendment adds new projects not previously included and updated existing projects for which significant project design and/or schedule changes identified.

The full 2040 MTP document listed below remains in effect as amended with information about other planned projects, including for other transportation modes, as well as extensive analysis and assessment of transportation issues and priorities in the area

Executive Summary 

Table of Contents

Chapter 1 - Introduction & Vision

Chapter 2 - Land Use & Transportation

Chapter 3 - Safety & Security

Chapter 4 - Roadway

Chapter 5 - Transit Element

Chapter 6 - Bicycle & Pedestrian

Chapter 7 - Freight

Chapter 8 - Travel Management & Strategies

Chapter 9 - Environmental Analysis

Chapter 10 - Financial Plan

Chapter 11 - Planning Assumptions & Air Quality Conformity

Chapter 12 - Action Plan

Appendix A

Appendix B

Appendix C

Appendix D

Final List of Projects Prior to Final MTP Document

Triad Air Quality Analysis

2015 Conformity Analysis Determination Report