The 2040 Metropolitan Transportation Plan (MTP) documents future transportation project needs and priorities for roadways, public transit, bicycles, and pedestrians. For any significant project to be selected in the Transportation Improvement Program it must first be listed in the MTP. This plan provides an assessment of future area transportation needs, issues with project recommendations, air quality analysis, along with future transportation funding recommendations. The 2040 MTP was adopted on September 23, 2015 by the TAC.

Draft 2040 MTP Amendment document available for public review

This document outlines amendments to the current 2040 Metropolitan Transportation Plan (MTP). The amendment will only affect the highway portion of the 2040 MTP and was prompted primarily by new projects developed under the Prioritization process and a change in project design and/or schedule. The document is available for public review through November 7.

Amendment 4 - Amends to reflect changes to the highway project listings resulting from Prioritization 5.0 and the FY 2020-2029 TIP development process. The amendment adds new projects not previously included and updated existing projects for which significant project design and/or schedule changes identified.

Amendment 3 - Amended September 2018 the 2040 MTP along with the 2018-2027 document. The amendment complies with federal regulations to establish performance measures for infrastructure condition, infrastructure reliability, and transit assets. The amendment has been made to ensure transportation projects are able to continue to move through the planning, design process and construction.

Amendment 2 - Amended May 2018 along with the 2018-2027 MTIP document. These documents were amended to comply with federal regulations to establish performance measures for safety. The amendment has been made to ensure transportation projects are able to continue to move through the planning, design process and construction.

Amendment 1 - Amended November 2017 to account for changes to the highway project listings resulting from Prioritization 4.0 and the FY 2018-2027 TIP development process. The amendment adds new projects not previously included and updated existing projects for which significant project design and/or schedule changes identified.

The full 2040 MTP document listed below remains in effect as amended with information about other planned projects, including for other transportation modes, as well as extensive analysis and assessment of transportation issues and priorities in the area

Executive Summary 

Table of Contents

Chapter 1 - Introduction & Vision

Chapter 2 - Land Use & Transportation

Chapter 3 - Safety & Security

Chapter 4 - Roadway

Chapter 5 - Transit Element

Chapter 6 - Bicycle & Pedestrian

Chapter 7 - Freight

Chapter 8 - Travel Management & Strategies

Chapter 9 - Environmental Analysis

Chapter 10 - Financial Plan

Chapter 11 - Planning Assumptions & Air Quality Conformity

Chapter 12 - Action Plan

Appendix A

Appendix B

Appendix C

Appendix D

Final List of Projects Prior to Final MTP Document

Triad Air Quality Analysis

2015 Conformity Analysis Determination Report