Pegg / Thatcher Feasibilty Study

Print
Press Enter to show all options, press Tab go to next option
The Feasibility Study Unit of NCDOT conducted this study to determine the feasibility of widening Pegg and Thatcher roads and how to connect them. Since the completion of this study, NCDOT has included a project (U-5003) in the State Transportation Improvement Program. This project is currently listed as unfunded. Get more information on the Pegg / Thatcher Feasibility Study .

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer