US 29 / Reedy Fork Parkway Interchange Study

Print
Press Enter to show all options, press Tab go to next option
The Greensboro Urban Area Metropolitan Planning Organization (GUAMPO), in coordination with the North Carolina Department of Transportation (NCDOT) Project Development and Environmental Analysis Branch (PDEA), is conducting a study on the future reconstruction of the US-29 / Reedy Fork Parkway Interchange (TIP Project R-4707). The study is also examining improvements to Summit Avenue from the interchange to Bryan Park Road.

A public workshop was conducted on November 11, 2006 to gather input on four design alternatives being considered. GUAMPO staff, consultants preparing the study and NCDOT officials were on hand to explain, discuss and answer questions. Meeting Handout  

Completion of the study is expected by early 2011 following further analysis, coordination with various agencies (federal highway, Army Corps of Engineers, NCDOT, and others), and further involvement with stakeholders and the public. Notices of future public involvement opportunities will be posted.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer