Downtown Greenway Phase 2

Print
Press Enter to show all options, press Tab go to next option

The Murrow Boulevard / Fisher Avenue corridor from E. Gate City Boulevard to N. Eugene Street is 1.5 miles of the future 4.2 mile multi-use trail that will loop around downtown Greensboro. The trail will provide a means for non-motorized forms of transportation, such as walking and bicycling. It will also enhance the urban landscape and transform Murrow Boulevard into a linear park.

 

Phase 2e & 3a

The City of Greensboro has awarded a construction contract to Yates Construction for Downtown Greenway Phase 2e along Fisher Avenue from Greene Street to Eugene Street and Phase 3a along Eugene Street from Fisher Avenue to Smith Street. The contractor was authorized to begin construction on October 10, with expected completion by August 2017.

Project Map

 

April 2015 Public Meeting Materials

The Department of Transportation (GDOT) hosted a public meeting to discuss the Downtown Greenway Phase 2 project. Public input was sought on the 50-percent design plans. The plans were revised to reduce the amount of roadwork involved for cost savings. This phase follows Murrow Boulevard from E. Gate City Boulevard to Fisher Avenue. 

Updated Meeting Maps: 
Map 1: Fisher Ave./Murrow Blvd. (from Greene St. to Lindsay Ave.) 
Map 2: Murrow Blvd. (from Lindsay Ave. to E. Gate City Blvd.) 

Meeting Flyer 
Survey

 

April 2013 Public Meeting Materials
The Department of Transportation hosted two meetings to discuss the Downtown Greenway Phase 2. Public input was received and is still needed concerning the 50-percent design plans for the Downtown Greenway Phase 2. This phase follows Murrow Boulevard from E. Gate City Boulevard to Fisher Avenue.

Maps:
    Map 1: Fisher Ave./Murrow Blvd. (from Greene St. to Lindsay Ave.)
    Map 2: Murrow Blvd. (from Lindsay Ave. to E. Gate City Blvd.)

Meeting Flyer
 

May 2011 Open House Materials for Phase 2e and 3a

Map of Phase 2e/3a from Greene Street to Prescott Street
Note: In this map, Phase 2 from Eugene Street to Greene Street is a modification to the March 30, 2010 design.

GDOT hosted two meetings to discuss the Downtown Greenway Phase 2 project. Each meeting was to gather public feedback about the 50-percent design plans for the Downtown Greenway Phase 2 along Murrow Boulevard from E. Gate City Boulevard to Fisher Avenue. Public feedback was used for the final design.


March 2010 Open House Materials

Maps

December 2009 Meeting Materials

Meeting Handout
Before and After Illustration 

Maps

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer